ADU vs Room Addition: Which is Better for San Diego Homeowners?
ADU vs room addition comparison for San Diego. Costs, rental income potential, permits, and which investment makes more sense for your property.
Need more space? San Diego homeowners often debate between building an ADU or a room addition. Here's a detailed comparison to help you decide.
What's the Difference?
ADU (Accessory Dwelling Unit)
A separate, complete living unit with its own entrance, kitchen, bathroom, and living space. Can be detached or attached to the main home.
Room Addition
An expansion of your existing home—adding bedrooms, bathrooms, or living space that's integrated with the main structure.
Cost Comparison
ADU Costs
- Detached ADU: $300-$450/sq ft ($150,000-$350,000 for 500-800 sq ft)
- Garage Conversion: $150-$250/sq ft ($60,000-$150,000)
- Attached ADU: $250-$400/sq ft ($125,000-$300,000)
Room Addition Costs
- Basic bedroom: $200-$350/sq ft ($50,000-$100,000 for 200-300 sq ft)
- Bedroom + bathroom: $250-$400/sq ft ($75,000-$150,000)
- Second story: $300-$500/sq ft ($150,000-$400,000)
Income Potential
ADU: Significant Rental Income
ADUs can generate $2,000-$4,000/month in rental income in San Diego. This often pays for the construction loan within 5-7 years.
Room Addition: No Direct Income
Room additions add living space but don't generate rental income (unless used for house hacking).
Property Value Impact
ADU
- Adds 20-30% to property value
- Appeals to investors and multi-generational buyers
- Can be sold with income history showing rental potential
Room Addition
- Adds value proportional to added square footage
- Typically 50-70% ROI at resale
- Increases home's appeal to larger families
Permitting Complexity
ADU Permits
- California's ADU laws streamline approval
- Ministerial approval (must be approved if meets requirements)
- No parking required in most cases
- Relaxed setback requirements (4 ft from property lines)
Room Addition Permits
- Standard building permit process
- Must meet all zoning setbacks
- May require variance for non-conforming lots
- Design review in some neighborhoods
Timeline Comparison
ADU: 8-14 Months Total
- Design: 4-8 weeks
- Permitting: 4-12 weeks
- Construction: 4-6 months
Room Addition: 4-8 Months Total
- Design: 2-6 weeks
- Permitting: 4-8 weeks
- Construction: 2-4 months
Which Should You Choose?
Choose an ADU if you want to:
- Generate rental income
- House aging parents with privacy
- Create a home office separate from main home
- Maximize property investment value
- Eventually sell as a duplex investment
Choose a room addition if you want to:
- Add bedrooms for growing family
- Expand kitchen or living areas
- Add a master suite
- Keep one unified home
- Faster, potentially lower-cost option
Get Expert Advice
One Stop Builders builds both ADUs and room additions. We'll help you evaluate your property and goals to determine the best option. Call (858) 567-0007 for a free consultation.